Refurbishment of the Construction Material and Electrical Material Storage Industrial Warehouse
The refurbishment works consisted in the refitting of a warehouse with a surface area of 1,800’00 m2 to upgrade same to the needs and prevailing regulations, depending on the type of use intended as a construction and electrical materials warehouse.